Our standard installation criteria accounts for most installations, but in certain circumstances, additional cost will be inevitable due to the extra work which needs to be done to install your charge point safely and diligently.
Our standard installation criteria:
Running of 15m of standard or armoured power cable, clipped to the wall
Drilling holes and routing of the cable through up to one internal and one external wall
Fitting and testing of electrical connections and protections, as required
Installation of components to meet the 18th Edition IET wiring regulations, as required (MCBs/RCD/earth rods in soft ground)
No special civil or electrical works
All charge point listed on our charge point comparison service are for a standard installation. Find the best charge point for you here